Project Overview

Proline Mechanical was appointed by MDK Construction Ltd to deliver the complete plumbing and heating package for a development of 12 new-build semi-detached houses in Northern Ireland.

The project covered the full mechanical installation across all 12 properties, from the initial first-fix plumbing and heating works through to second fix, sanitary ware, kitchen appliances and final commissioning.

With a programme spanning 18 months, the project required careful coordination throughout the different stages of construction. Proline Mechanical worked alongside MDK Construction and the wider construction team to ensure materials, labour and mechanical installations were delivered at the right stage of the build.

The objective was straightforward: provide a complete, professionally installed plumbing and heating system for every property, ready for the new tenants to move in on completion.

The Challenge

New-build residential developments involve a constantly changing working environment, with multiple trades working through the properties at different stages.

For the mechanical installation, timing is particularly important. First-fix plumbing and heating needs to be completed before walls and floors are closed up, while second-fix works, bathrooms, kitchen connections and commissioning take place much later in the construction programme.

Proline Mechanical therefore had to manage its labour and materials carefully across the 12 properties, coordinating the mechanical works with other trades and adapting to the progress of each individual house.

The 18-month programme also meant maintaining consistency throughout the development, ensuring that the same high standard of plumbing and heating installation was achieved across every property.

Complete Plumbing & Heating Installation

Proline Mechanical delivered a complete mechanical package covering the plumbing, heating, gas and waste systems throughout all 12 semi-detached homes.

The works included:

  • First-fix plumbing and heating
  • Second-fix plumbing and heating
  • Gas installation
  • Waste pipework
  • Bathroom plumbing and sanitary ware
  • Kitchen appliance connections
  • Domestic plumbing systems
  • Heating installation
  • Mechanical pipework
  • Final commissioning

By providing the complete installation, Proline Mechanical was able to manage the mechanical works from the early construction stages through to final completion.

This approach reduced the need for multiple specialist contractors and provided MDK Construction with a dedicated mechanical subcontractor for the construction project.

First-Fix Plumbing & Heating

The first-fix stage established the essential infrastructure required within each property.

This included the installation of plumbing and heating pipework, waste systems and associated services before the relevant walls, floors and other construction elements were completed.

Careful coordination at this stage was essential. Pipework had to be installed in the correct locations and at the appropriate stage of the build, while allowing other trades to continue their own work.

With 12 properties progressing through construction, Proline Mechanical coordinated its installation schedule with the wider site programme to maintain progress across the development.

Second Fix & Final Installation

Once the properties reached the appropriate stage of construction, Proline Mechanical returned to complete the second-fix mechanical works.

This included bathroom installations, sanitary ware, kitchen appliance connections and the completion of the heating and plumbing systems.

The team also completed the necessary commissioning works, ensuring that the installed systems were ready for use when the properties were handed over.

Managing both first and second fix under one mechanical package helped maintain continuity throughout the development and allowed Proline Mechanical to remain involved from the initial installation through to completion.

Managing Labour, Materials & Programme

One of the most important aspects of the project was effective programme management.

With 12 homes under construction simultaneously or at different stages, the mechanical team needed to ensure the right resources and materials were available when required.

Proline Mechanical worked closely with MDK Construction and the other trades to coordinate access to the properties and schedule plumbing and heating works around the wider construction programme.

This included planning labour requirements, managing materials and ensuring that mechanical works did not hold up subsequent stages of construction.

The ability to coordinate these elements effectively was central to keeping the project on schedule.

The Result

Proline Mechanical successfully delivered the complete plumbing, heating, gas and waste installation across all 12 new-build semi-detached properties.

The works were completed across the 18-month programme, covering everything from first fix through to second fix, bathroom and kitchen installations and final commissioning.

The successful completion of the mechanical package allowed all 12 properties to be completed on time and prepared for their new tenants to move in.

For MDK Construction, the project provided a complete mechanical installation delivered by one experienced contractor, with Proline Mechanical managing the plumbing and heating works throughout the different stages of construction.

Experienced New-Build Mechanical Contractor

The MDK Construction project demonstrates Proline Mechanical’s experience in delivering complete mechanical packages for new-build residential developments in Northern Ireland.

From first-fix plumbing and heating through to sanitary ware, kitchen appliances, gas, waste systems and commissioning, Proline Mechanical can provide a complete installation service to developers, main contractors and construction companies.

As an experienced mechanical contractor in Northern Ireland and building services contractor, Proline Mechanical understands the importance of coordinating mechanical works with the wider construction programme.

The company’s ability to manage labour, materials and installation schedules makes it a reliable choice for developers looking for a commercial plumbing contractor in Northern Ireland or a mechanical subcontractor for new-build projects.

Plumbing & Heating Installation for New-Build Developments

Proline Mechanical provides plumbing, heating, gas, mechanical pipework and building services for new-build residential and commercial developments throughout Northern Ireland and Ireland.

Whether the project involves a small housing development or a larger construction programme, Proline Mechanical provides the mechanical expertise required to deliver the installation from first fix through to commissioning and completion.

Contact Proline Mechanical to discuss your next new-build plumbing and heating project.

Previous Post

Client Testimonials

You have been successfully Subscribed! Ops! Something went wrong, please try again.

About Us

Proline Mechanical

Trusted mechanical subcontractor for large-scale projects delivering commercial plumbing, mechanical pipework, and industrial wastewater solutions across Northern Ireland, the Republic of Ireland, and the UK.

Get In touch

© 2026 Copyrights Reserved

Get in touch

Request a Quotation

We will get back to you as soon as possible